Posted Sep 21, 2018, 10:40 PM
|
 |
Moderator
|
|
Join Date: May 2006
Location: Right here, right now
Posts: 12,729
|
|
Kevin's post about the height being listed as 433' on the new FAA permit may be a hint about the change - maybe it lost a floor. Either way, the parking lot won't be there long because the building is 100% pre-leased.
|