Quote:
Originally Posted by maru2501
the glass will be a cascading failure because I am sure it already is delaying work they would be doing on the interior of lower floors that they don't want exposed to weather
|
It's not difficult to provide temporary covers/tarps/etc over a floor(s) to work during cold weather months in an interior space, if the exterior wall has not been installed yet..you see it all of the time for high rise construction projects in Chicago and elsewhere.