View Single Post
  #2685  
Old Posted Oct 13, 2017, 7:52 PM
LeftCoaster's Avatar
LeftCoaster LeftCoaster is offline
Moderator
 
Join Date: Nov 2005
Location: Toroncouver
Posts: 13,131
^^ Quite frustrating indeed.

Quote:
Originally Posted by nickbeaulieu View Post
They haven't replaced anything other than that first band at the top, right? Anyone know why they've moved 2 rows down?
The freight elevator only goes to the 23rd floor so the work platform needs to be dropped down to 23 to load up then lifted back to 25 to perform the work.
Reply With Quote