I wonder if the new version of the towers will be built all at once or in a phases. The original bold plan was to build both at the same time. Phasing is considered less risky, and with this risk-adverse new version of the towers, it has me wondering that phasing may be a better option here. Think of it this way, after the developer and banks see a major success in phase 1 leasing, it may inspire them to think bigger about phase 2. On a side note, I'm convinced that's whats happening now with Urby II and III. No inside info, just a hunch.
|