View Single Post
  #2  
Old Posted Aug 18, 2017, 5:28 AM
The ATX's Avatar
The ATX The ATX is offline
Moderator
 
Join Date: May 2006
Location: Right here, right now
Posts: 12,730
After reading the AULCC meeting notes, I see why this is going through the AULCC process. They need to move overhead power lines to install the tower crane. There is another note that says the estimated construction period would be from this October through January 2020.
__________________
Follow The ATX on X:
https://x.com/TheATX1

Things will be great when you're downtown.
Reply With Quote