Originally Posted by Pedestrian
^^They appear to be driving piles but those piles appear only about 100 ft long, less than half the distance to bedrock only a block away (at both Salesforce and 181 Fremont). I wish we had someone to really explain what's happening to us. At both those other buildings the supportive piles weren't driven but cast in place--that is, they drill a hole, insert some pre-formed rebar framework and pour concrete into the hole. I thought they'd do that here too.
|
This is just work to build the soil support wall for the eventual hole. Nothing is structural yet.