View Single Post
  #2301  
Old Posted Apr 13, 2017, 3:07 AM
Bombardier Bombardier is offline
Registered User
 
Join Date: Aug 2016
Location: Chicago, IL
Posts: 470
^That is post tensioned cabling. After the concrete is poured, they will put the cables in tension to strengthen the deck. This allows for much less traditional rebar in the deck.
Reply With Quote