25 Columbus comes in at 52 floors. They were limited to 750 units and was able to fit it in 52 storys out of the 60 maximum allowed. The same thing happened for the 95 story, 990 ft limit for 99 Hudson, when only 72 floors was needed to fill the maximum allowed 1.2 million sqft.

A little disappointed as there will be three towers all around the same height. But 750 units and a school is 750 units and a school

http://www.nj.com/hudson/index.ssf/2..._jersey_c.html

Quote:
Construction is expected to start in July and complete in January 2020.
Wow. This one is happening much faster than I expected.