CHICAGO | St. Regis Chicago (Vista) | 1,191 FT | 101 FLOORS


1191279063.jpg
 
Probably not as they hadn't delivered bits or caisson liners nor rebar to assemble cages. Patience, it'll happen.

I did walk by. Very close. There are liners there, but they seem to be smaller ones, and the rebar had just been delivered. Flatbed truck still was there.

The actual drill that hangs off the end of the crane still is not there
 
Yeah, if they were tying cages yesterday surely they will be in the ground today. They never just stack that shit up or the site would be a total mess. Put the cages together and drop em the ground. Let's go Case, get your butts in gear.
 
So they are going to be using Gems 2 for staging. Would have been cool to see them build both those foundations at once. would have looked like one ,even more, massive site.
 