Quote:
Originally Posted by OKTX View Post
Actually, it looks like this one has momentum. Hotel/Condo's planned to break ground EOY'16 and multi sometime next year.

https://www.bisnow.com/austin-san-an...61686?rt=20046
EOY 16 is only 5-6 months away. According to that article they don't have permits or a hotel brand signed up yet, although he says he's close on the hotel. It takes about 9 months to get a permit through the city for something this large. Under-construction by the end of 2017 is doable if he's got everything teed up and ready to go, including construction loans, contractors, permits, hotel brand buy-in, etc. Sutton Co. is not know for being incredibly proactive. I'm guessing he's being optimistic about the start dates because he's speaking at the Bisnow Multifamily Conference. He still has a window to pull this off so I wouldn't count him out. I'm not entirely optimistic that it will happen this development cycle, however. [In both of these quotes, the emphasis is mine.]

Quote:
Likewise, he’s already nearly finalized the flags for the Waller Park Place hotel project, and says that market is strong.
Quote:
Mac hopes to be under construction on the multifamily/office building by the end of 2017; he tells us his team will start the permit process almost immediately.
Edited to add the picture from that article: