If planners go this route, things could get really confusing around Union Station, as if they were not confusing enough as it is.
Planners Weigh Options for Downtown Waterfront Transit Link.
Quote:
Perhaps the most radical possibility outlined would be a new tunnel to allow LRTs to pass through Union instead of terminating there, connecting to Queens Quay East underneath the rail corridor and Freehand Street.
Alternatively, the Western arm of Queens Quay could connect to a second terminus west of Union, with GO, SmartTrack and UPX connections. A second terminus at Liberty Village or Cherry Street was considered by Metrolinx in 2012 and concluded it would, "not effectively serve future GO Rail passenger employment destinations and current GO patrons [and raises] planning, property and infrastructure issues." However this evaluation was done before the emergence of SmartTrack, which might place its own additional burdens on Union Station.
|