Quote:
Originally Posted by Spring2008
Looks like another couple towers on the go.
Don't want to jump the gun but AB boots completely demolished and cleared, site servicing looks to be complete, and a small drill working away along the northern periphery of the site.
|
Can confirm that drilling has def started. Wasn't sure initially because drill is a bit different than i'm used to seeing. Saw some smallish piles being driven today. The smaller drill/piles looks to be due to only two below grade parking levels being built on the hotel side as well as all parking being built above grade on the apartment tower side.
GWL has this listed as two 35 storey towers.
http://www.gwlrealtyadvisors.com/Properties/AlbertaBootSite.aspx