Posted Nov 22, 2015, 4:47 AM
|
 |
Registered User
|
|
Join Date: Jun 2009
Location: Between RRock and a hard place
Posts: 4,474
|
|
Then I saw this picture and that's the same blue portable crane vehicle and the same white steel pieces that were at ZaZa the other day. Is it possible they went to the wrong site, and then realized their mistake? It seems ridiculous but what else explains the equipment being removed from ZaZa.[/QUOTE]
I wanted to say something on the ZaZa thread about this but I didn't want to seem like a debbie downer, but I was going to say that I thought the ZaZa lot was being used as a staging area for the crane pieces destined for a different contruction site. If these are indeed those pieces, then I would have been a genius if I went through with that post.
Anyway, this is going to go up fast, perhaps 2 floors every 7 to 8 days once they get passed the first three or four. Topping out should be April - May, unless of course, they get the 2 to 3 man crew who worked on the library.
|