View Single Post
  #971  
Old Posted Aug 25, 2015, 7:18 AM
SoCal Alan SoCal Alan is offline
Registered User
 
Join Date: Sep 2006
Posts: 242
Quote:
Originally Posted by rocketman_95046 View Post
Rumor is that some of the footings need to be redone. concrete strength did not pass tests.

Not good news, may be some delay/rework.

Trying to get confirmation on this.
I talked to a construction worker today. I asked him about the piles and he told me that two of the piles did not pass the concrete test, so they have to be redone. That's why they are digging, and it will be a six month delay.
Reply With Quote