Thread
:
JERSEY CITY | Projects and Construction thread
View Single Post
#
133
Posted
Jul 20, 2015, 3:30 AM
Nexis4Jersey
Greetings from New Jersey
Join Date: Mar 2009
Location: North Jersey
Posts: 3,369
Late June - Downtown Jersey City Update from
Brandon Nagle
Quote:
The Newark Street Pedestrian Plaza has apparently become permanent, as the road markings are being removed.
Jersey Avenue and Christopher Columbus 7? story retail and residential building
Liberty Harbor
Montgomery and Grove condos
33 Park Avenue, once the foundation piles are finished and the slab is poured, this will begin rising fast. They can't excavate due to flooding.
99 Hudson Street site was empty of cars, but untouched.
The new hotel by Harborside
URL Harborside. It was 42 stories high as of June 28th.
The old Harborside model is still prominently displayed.
The large building in the front and the left twin were built exactly as is. The two tall right side buildings have been replaced by URL Harborside's three 70 story towers. The tall building on the left remains a parking lot.
Trump Plaza II
Marbella II (M2) and 110 First Street
This dog park was destroyed during construction and is being rebuilt to a different design.
143 Second Street (they are doing some kind of renovation here.)
The Oakman
Toll Brothers Provost Square
70-90 Columbus
__________________
Check out my Sites
My
Flick
r
http://www.flickr.com/photos/42178139@N06/sets/
My Youtube
http://www.youtube.com/user/Nexis4Jersey?feature=mhw5
Nexis4Jersey
View Public Profile
Find all posts by Nexis4Jersey