Posted Jul 7, 2015, 6:29 PM
|
 |
Moderator
|
|
Join Date: Jan 2009
Location: Austin, TX / Portland,OR / Chicago, IL
Posts: 14,383
|
|
Quote:
Originally Posted by dollaztx
|
Foundation work (such as drilling caissons) will have to occur before a project can be moved to the u/c section.
|