Agreed. As for the prelim schematic showing a possible heavy rail allignment, I must say I wish they would plan and build ahead of time a subterranean station in the lowest level,of the terminal and a future connection could tunnel under the GC and be completely climate controlled. Who wants to arrive at LGA in the winter with their fine luggage and stand at a windswept elevated platform? All that should be inside the terminal itself and that has to be planned for NOW.
__________________
Everything new is old again
Trumpism is the road to ruin
|