Thread: Medford
View Single Post
  #17  
Old Posted Dec 28, 2011, 10:40 PM
NickName NickName is offline
Registered User
 
Join Date: Aug 2011
Location: 714 / 541
Posts: 75
12/28/11 UPDATE
Looks like floors 2 & 3 are getting windows installed along with the bracing for the exterior panels starting to be installed.
Reply With Quote