Posted May 8, 2011, 4:24 AM
|
 |
Ferris Wheel Hater
|
|
Join Date: Jun 2006
Posts: 8,373
|
|
The cost difference might not be much for cut and covering only the last 2.5Km but the time savings would be significant as you could have the 2.5K done at the same time as the boring is taking place.
|