Quote:
Originally Posted by cybele
The last I read that big Novare thing (I forget what it was called) at Atlantic Station was 0% sold.
|
Technically you are correct that they are 0% sold but that doesn't mean there aren't units under contract. A new building is required to have a certain percent under contract before sales (closings) can begin.