Thread: Shovel ready
View Single Post
  #44  
Old Posted Apr 28, 2009, 1:56 PM
SteelTown's Avatar
SteelTown SteelTown is offline
It's Hammer Time
 
Join Date: Mar 2004
Location: Hamilton
Posts: 20,304
The road repair only accounts 20% of the $130 million.

The Linc from the 403 exit ramp and along the Meadowland badly needs to be repaved. Potholes after potholes and not these tiny potholes they are bigger than a large pizza and deep.
Reply With Quote