Posted Apr 28, 2009, 1:56 PM
|
 |
It's Hammer Time
|
|
Join Date: Mar 2004
Location: Hamilton
Posts: 20,304
|
|
The road repair only accounts 20% of the $130 million.
The Linc from the 403 exit ramp and along the Meadowland badly needs to be repaved. Potholes after potholes and not these tiny potholes they are bigger than a large pizza and deep.
|