View Single Post
  #11  
Old Posted Jul 21, 2008, 9:12 PM
twoNeurons twoNeurons is offline
loafing in lotusland
 
Join Date: Aug 2002
Location: Lotusland
Posts: 6,090
Quote:
Originally Posted by jlousa View Post
Construction of Phase one is set for 2009. So pretty soon, the zoning is taken care of as far as I know, they just changed the scope of it, phase 1 will be much larger and phase 2 smaller, the total hasn't changed. Could be interesting timing if we get the expected slowdown.
I was thinking the same thing. I wonder if this would affect how quickly the neighborhood gets built out. Pretty hard to sell pre-sales in a declining market.
Reply With Quote