Thread: Retail News
View Single Post
  #40  
Old Posted Feb 14, 2008, 2:13 PM
raisethehammer raisethehammer is offline
Closed account
 
Join Date: May 2005
Posts: 6,054
yea, I'm impressed with that transit terminal. Only thing I would have done differently is to extend the covered walkway right to the mall doors and use some longer shelter/terminal structure like the ones on McNab downtown instead of a whole pile of those individual bus stops that only hold 5 people.
Other than that, it's great. And I'm sure they'll evaluate, get some feedback and improve on that design for future terminals at Limeridge, McMaster, Centre Mall and elsewhere.
Reply With Quote