Quote:
Originally Posted by DC83
Currently, 4 of the 9 bays on the eastern half of hub are being used. I believe there are 7 bays on the western half. Maybe 3 or 4 of those are used... I'm not 100% sure as I never use that side, usually just the GO side.
|
Some of the "used" bays are dedicated to long distance coaches which only come in once every hour or less. A lot of these buses could share one bay with some tweaks to scheduling. Or there could be one or two long distance bays used for unloading, then the bus parks across the lot if it needs to layover for a while before loading back up. Anyway, I think the city has already studied this and the capacity is there. We could physically be utilizing TH&B as a terminal tomorrow if we really wanted to.