Another Hamilton stalled project that tore down a beautiful building for a pile of rubble. Add to that list HMP and if our local property speculators had their choice Lister and the Federal Building would be a pile of rubble too.
I thought there was a by-law that went with a demo permit? If they didn't build within a certain time fines are to be levied. Or is the by-law so weak that it doesn't specify 'all the land has to be used". ie erecting a portabble office building is enough to satisfy the writing in the by-law. St. Joes is going to do the same thing. Demo a building and in its place put a portable.
__________________
Height restrictions and Set-backs are for Nimbys and the suburbs.
|