View Single Post
  #5259  
Old Posted Jul 4, 2026, 8:45 PM
gecho111 gecho111 is offline
Registered User
 
Join Date: Apr 2022
Location: Regina
Posts: 901
Rain seems to be slowing down the Coopertown work. Pipes in for 2 of the 3 curved roads, the longest closest to the edge left to do. They dug a trench to collect water and pump out. North Albert bridge might be ready for concrete some time next week. I'll have to keep an eye out for an overnight road restriction.

11th Ave video: https://www.youtube.com/watch?v=PHJIFTeD7O4

Coopertown Panorama: https://cdn.pannellum.org/2.5/pannellum....r.com/65535/55374412188_a80c4c96a6_o.jpg

https://www.flickr.com/photos/reginaconstruction/




Last edited by gecho111; Jul 4, 2026 at 9:23 PM.
Reply With Quote