Posted May 14, 2026, 10:28 PM
|
 |
Registered User
|
|
Join Date: Aug 2023
Location: Sheboygan
Posts: 2,490
|
|
Quote:
Originally Posted by chitowncyclone
Keep in mind that the base of 50 HY is around 200 ft x 350 ft tapering to a top of 200 ft x 250 ft whereas site C1 (where the office tower would be) is around 200 ft x 250 ft so the base of the office tower would be about the same dimensions as the top of 50 HY. Logically, the new office tower should be taller as its starting from a smaller base.
|
Good point!
__________________
24601
|