For me the T.O proposal I'm looking forward to seeing some movement on is 53-55 Yonge. It appears more demo work on the site is about to begin.
Project Details
The site is located at the southeast corner of Yonge Street and Colborne Street, adjacent to the King subway station.
Status: Pre-construction (demolition in progress from July 2025 to May 2026).
Developer: H&R REIT.
Proposed Building: A 68-storey mixed-use building with 836 residential units and ground-level retail space.
Current Buildings: Previously occupied by a 5-storey building (53 Yonge) and a 12-storey office building (55 Yonge).
Parking: Plans include 3 levels of underground parking.
source:
https://admin.55yonge.ca