Thread
:
Construction Sites In your City II
View Single Post
#
674
Posted
Dec 26, 2025, 5:59 PM
Maldive
Registered User
Join Date: Sep 2004
Posts: 5,061
Ontario Place: West Island / Therme Waterpark & Spa | 45.15m | 9s | Therme Group | Diamond Schmitt l site prep complete
The exterior refurbishment of the original pods and pedestrian bridge is complete and the entire
Therme
site looks prepped for construction.
kotsy
The scaled back waterpark and spa results in more public space and a large beach facing south-west.
UT
UT
UT
Rooftop infinity pool
.
UT
UT
TMU: Student Wellbeing Centre | 34.38m | 8s | TMU | Hariri Pontarini l excavation
Renamed
Nadir Mohamed Centre for Student Wellbeing
.
UT
YongeBloor
UT
UT
__________________
circa
2008
: home of the
3rd
best skyline in N.A.
+++
circa
2028
:
home of the
2nd
best skyline in N.A.
(T-Dot)
Maldive
View Public Profile
Find all posts by Maldive