View Single Post
  #17  
Old Posted Dec 2, 2025, 2:59 AM
mrnyc mrnyc is offline
cle/west village/shaolin
 
Join Date: Jul 2006
Posts: 14,672
a flats bazinga —



Developers plan $60 million hotel at old mill site in the Flats


Six-story building will be turned into a new hotel. An operating partner to help develop and then manage the hotel is already secured. Tax credit decisions should come before the end of the year.

"The exterior of the Mill building will undergo a comprehensive rehabilitation. Historic brick, wood, and concrete exterior walls will be repaired. Existing openings will largely be retained, with minor modifications, and prepared to receive new windows and doors matching the historic appearance. All roofs will be replaced to match historic conditions, with new rooftop decks to be created on the existing roofs of the main mill."

Floors 2 through 6 will house the hotel. First floor will house the main entrance and hotel lobby. Hotel's restaurant will occupy the remainder of the first floor.

The interior of the two story warehouse will be converted to house commercial tenant spaces including a restaurant and event space on the first floor, and a data center on the second floor.

The project will create 83 new permanent jobs and 377 construction jobs.


more:
https://www.crainscleveland.com/real...flats-district


The former Cleveland Milling Co. site in the flats
Reply With Quote