View Single Post
  #84  
Old Posted Apr 23, 2025, 1:28 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,991
Have started landing the 6th floor precast floor slabs. They appear to be on a floor every 3 week pace. Should see the final 11 floor wrapping up in 18 weeks.
Reply With Quote