Posted Jan 30, 2025, 12:33 AM
|
|
cle/west village/shaolin
|
|
Join Date: Jul 2006
Posts: 14,668
|
|
tools gonna tool.
it’ll get a little height knocked down to save face and get built, as it should be.
same is going to happen via the southbridge posse for the proposed tower next to pace.
a little give and take is all part of the process, yeah it can be ridiculous, but both of these will be built.
|