Even though it's a PA project I feel like an effort should have been made to roll the construction of the (7) infill station at 10 Av into this megaproject to take advantage of economies of scale and get it done while everything is dug up anyway. Terribly shortsighted by the city and MTA. It would have been awesome to see both the station and the bus terminal open at the same time.
Do we know if there will be provisions built into the 9 Av base of the PABT for the future station connection?
__________________
Everything new is old again
Sic semper tyrannis
|