View Single Post
  #57  
Old Posted Aug 1, 2024, 5:27 PM
jonny golden jonny golden is online now
Registered User
 
Join Date: May 2019
Posts: 2,929
Quote:
Originally Posted by MonctonRad View Post
They are pre leasing for tower two. Perhaps he saw the numbers for the second tower
I also heard from a source on two separate occasions that the 1st tower was fully leased. There was a report in the news not too long ago stating that the vacancy rate in NB was the lowest it had been in over 30 years at 1.5% - and that is province wide.

I'd agree that the 70% figure must be for the 2nd building.
Reply With Quote