Where is the new library going to go? I thought they were just gonna build a new one where the old one exists now.
2025 NW Overton St
Where is the new library going to go? I thought they were just gonna build a new one where the old one exists now.
Why DoveLewis emergency veterinary hospital is doubling in size and adding specialty care
![]()
DoveLewis Veterinary Emergency & Specialty Hospital completed a major expansion in late 2019, just before the Covid-19 pandemic sent pet ownership soaring.
The 24/7 pet ER found itself, once again, running short on space.
Now the practice is poised to more than double its footprint, with a brand new building under construction across from its flagship clinic on Northwest Pettygrove Street in Portland’s Slabtown neighborhood.
When the expansion is complete this fall, DoveLewis will be one of the largest veterinary hospitals in the U.S. outside of a university setting — a fitting milestone for the first emergency animal hospital in the country, founded in 1973.
“It’s an interesting time to go through an expansion, coming off the heels of the pandemic,” Ron Morgan, president and CEO of DoveLewis, said in an interview last week. “This building solidifies our future here for decades.”
Oh, interesting location. I can see why they would want the main entrance facing the future park...whenever that gets built. Though with such an interesting location, I do wonder why not do a gallery building with entrances on both sides of the building?
It won't face the park, though, it's about mid-block (actually directly across from the current Dove Lewis building, closer to 19th than 20th).
After seven years, a multifamily building opens
![]()
Officially, the real estate investors, architects and construction executives who gathered in Northwest Portland last week came together to celebrate the opening of Merx, a 126-unit mixed-use building.
But in a sense, they were celebrating the last breath of the pre-pandemic real estate cycle.
Merx was conceived in 2017, before COVID-19 delayed projects around the nation and sent construction prices spiraling by making everything from loans to concrete more expensive.
“We started this process seven years ago, so the landscape was somewhat different,” said project co-owner Richard Smith, founder of Deacon Development. He undertook the project with Steve Deacon, founder and board chairman of Deacon Construction. The two are longtime colleagues — Smith was Deacon Construction’s first full-time hire in 1982 as project engineer.
Merx, at 1910 N.W. Pettygrove St., was part of a wave of projects submitted just before Portland’s inclusionary zoning rules took effect, requiring affordable units in apartment buildings of 20 units or more. The property was purchased for $2.55 million in October 2017.
Deacon Construction began construction of the 57,412-square-foot building in August 2022, enduring pandemic-related disruptions and workforce challenges, a historic ice storm and delivery delays of construction materials.
Not sure what this sale is about. $33M. Didn't it just sell at foreclosure in Feb at $37.7M (posts above)?
Menashe, again.
I'm worried they are just buying up bargain basement prices all over and plan to sit on them for as long as needed to make a huge profit, with no intention of renovating and/or leasing up.
https://www.oregonlive.com/business...ells-for-fraction-of-previous-sale-price.html
Not sure what this sale is about. $33M. Didn't it just sell at foreclosure in Feb at $37.7M (posts above)?
Menashe, again.
I'm worried they are just buying up bargain basement prices all over and plan to sit on them for as long as needed to make a huge profit, with no intention of renovating and/or leasing up.
https://www.oregonlive.com/business...ells-for-fraction-of-previous-sale-price.html
Semi-related, does anybody know how on earth UrbanWorks sits on so many empty properties for so long? It feels like they've got dozens of empty storefronts in the Pearl and it feels like none of them ever get tenants.
I don't know much about CRE but I have a hard time understanding how they manage to hold so much vacant space.
Urban Works is a realtor, not a property owner. Their focus is on leasing urban retail space, that's why you see their signs so much...which is a bit challenging today.
The project is anticipated to be a 5-story mixed use building with ground floor retail, residential apartments, and basement parking. R141344 is a contributing resource in the Alphabet Historic District. R141345 & R198363 are non-contributing resources in the Alphabet Historic District.
A Pre-Application Conference to discuss a 4 to 5 story mixed use building with ground floor retail and approximately 99 dwelling units. Parking for approximately 68 vehicles will be provided in a basement garage accessed from NW Kearney St.
https://www.portlandmaps.com/detail/permit/2024-095745-000-00-EA/5099871_did/
This is back - dropped a couple floors
Frankly I am relieved to see this proposal be revived at 3-stories, which will probably piss off many here on this site who urge for taller buildings. I was closely involved with this one a few years ago as it went through preliminary design review with the NWDA. At its previous height, even with some minor stepbacks at the top, it struggled to be comfortable with its neighboring buildings. At 3 stories it will be a much easier neighbor to live next to.