The have now completed the 4th floor and have landed the 5th floor precast concrete floor slabs. They must have poured the north section of the L1 floor as they are forming now for the ground floor slab on that part of the underground parking garage.
Using precast concrete wall and floor slabs should see this 14s building topped out by the end of the year.