Quote:
Originally Posted by Monctoncore
I would say it’s either going to be used for Pile driving or used to assemble the larger crane when it arrives. Though pile driving seems like the more obvious answer. They wouldn’t use a crane this big to test the ground for engineering purposes. Usually engineers would do what’s referred to as “test pit” which is to see if the ground is stable. Though there is a Pit Viper which looks like a crane that drills deep into the ground, but those are usually only used mining operations.
|
Where it's close to the river they may take soil samples but that is usually done with a drill mounted in a small tracked vehicle from what I've seen.