View Single Post
  #7  
Old Posted Jan 7, 2024, 1:53 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,864
The bridge EA has now been completed.


https://pub-london.escribemeetings.com/filestream.ashx?DocumentId=105378


The recommended rehabilitation improvements include:


• Replacement of the concrete deck slab and repairs to substructure components.
• Repair and coating of structural steel components.
• Replacement of the existing pedestrian railing with a new railing system that replicates the aesthetic appeal of the original design.
• Construction of a crash tested barrier system on the north side of the bridge.
• Construction of decorative pillars with a name and date stone on the west end of the bridge similar to the original pillars which were removed in 2006.
• Increased travel lane widths from 3.0 m to 3.25 m to correspond closer to City Standards. Increased sidewalk widths from 1.83 m to 2.00 m as well as a raised 2.40 m wide cycle track.
Reply With Quote