Quote:
Originally Posted by Beedok
That would be a reopening of an old line, but it does seem reasonably likely to happen soon.
|
Line 2 in Ottawa also includes:
-Construction of two new stations and the extension of five station platforms on the existing Trillium Line to accommodate longer trains with additional capacity.
-Four new stations along the new extension and two new stations along the 4-kilometre Airport Link.
-Construction of a new Walkley Yard Maintenance and Storage Facility (MSF).
So new track and new stations. Not a net new line but more transit for sure.