Thread
:
PHILADELPHIA | CHOP New Patient Tower | 434 FT | 23 FLOORS
View Single Post
#
72
Posted
Oct 27, 2023, 7:37 PM
DrMellowSkiBum
Registered User
Join Date: Apr 2023
Posts: 9
Second tower crane coming in. Wood is down to the 4th (of 6 plus a mechanical level on top) floor although most of the steel frame for the 5th floor is still being disassembled.
DrMellowSkiBum
View Public Profile
Find all posts by DrMellowSkiBum