Quote:
Originally Posted by TheHonestMaple
From what I understand phase 1 and 2 towers will be under construction simultaneously. Then the third tower will start after those two are done.
|
I'm not so sure. It looks like they're starting with Phase 3 according to what wa sold and what the pictures above show. If the crane base is for phase 3, then I can imagine all three being built simultaneously. Since phase 1 & 2 are "sold out".