BUILDING REQUEST: Stationside (x2) | Milton, Canada | Proposed |
Country: Canada
State/Province: Ontario City: Milton Building Name: Stationside Tower 1 Native Name: Other Names: Street Address: 145-151 Nipissing Rd Postal Code: L9T 1R3 Architect(s): KNYMH Inc Developer: Neatt Communities Official sources: Interesting Facts/Records (in own words): Official Building Website URL: https://www.knymh.com/Portfolio/Resi...se/Stationside Wikipedia.org URL: CTBUH.org URL : Structurae.de URL: Coordinates (with decimal fraction): 43.52089676959886, -79.87222614998998 Heights-- Reminder: - antenna: - spire: - roof: - top floor: - other heights: Current Building Status (Built, Proposed, Cancelled, Destroyed, etc...): Proposed Construction Dates-- - started: - finished: - destroyed: Above ground floors: 23 Underground floors: Unit count: Building Use(s): Residential Structure Type(s): Highrise https://urbantoronto.ca/forum/attach...59-png.365475/ https://cdn.skyrisecities.com/sites/...81-164031.jpeg |
Country: Canada
State/Province: Ontario City: Milton Building Name: Stationside Tower 2 Native Name: Other Names: Street Address: 145-151 Nipissing Rd Postal Code: L9T 1R3 Architect(s): KNYMH Inc Developer: Neatt Communities Official sources: Interesting Facts/Records (in own words): Official Building Website URL: https://www.knymh.com/Portfolio/Resi...se/Stationside Wikipedia.org URL: CTBUH.org URL : Structurae.de URL: Coordinates (with decimal fraction): 43.520844434009625, -79.87150891372728 Heights-- Reminder: - antenna: - spire: - roof: - top floor: - other heights: Current Building Status (Built, Proposed, Cancelled, Destroyed, etc...): Proposed Construction Dates-- - started: - finished: - destroyed: Above ground floors: 19 Underground floors: Unit count: Building Use(s): Residential Structure Type(s): Highrise |
|
All times are GMT. The time now is 9:02 PM. |
Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.