![]() |
Victoria Island Remediation
5 years too late but since it will be going for another 2 or 3 here's the thread.
About the project https://live.staticflickr.com/65535/...b07d10cd_h.jpg |
So, will the island continue to be disjointed (but newly detoxified) patches of greenspace that 3 people pass through every hour, a hydro plant, random ruins and inaccessible buildings, some tepees and random plaques and monuments... or are there plans to develop the island into a proper park and/or community eventually?
|
Quote:
|
1. Turn it upside down, cut every single tree and bush
2. Declare it nationally significant greenspace and nature conservation site, so it must see minimal usage |
The buildings closest to Zibi were in use. One was a climbing gym.
Was the entire island given to the Indigenous, or just the part east of Portage? |
Here's a nice description of the project from someone on the ground:
https://ncc-ccn.gc.ca/blog/theres-mo...-meets-the-eye |
Quote:
|
I really hope NCC does something more that what they already have with the Victoria Island Timber Slide.
https://live.staticflickr.com/65535/...022d3ae8_h.jpg https://live.staticflickr.com/65535/...1b75f32b_h.jpg Throw away the iron trough (why it's even still there?), let the water flow, open it up for the public. Find a partner in one of the local rafting companies and have them maintain and manage it and run their rafts down the slide. This could be a major tourist attraction for next to no cost. Repurpose one of the abandoned buildings on the Island for the Timber Trade History Museum. So much history there and such a unique and fitting thing. I didn't even know that Royals came to visit and rode the slide in the 18xx. Anybody have any more photos from here? https://d3d0lqu00lnqvz.cloudfront.ne...andduchess.jpg https://d3d0lqu00lnqvz.cloudfront.ne...rslidehull.jpg https://upload.wikimedia.org/wikiped...slide_1901.jpg |
Can you imagine people sliding down that thing today? The bureaucracy involved would be mind-boggling.
|
Quote:
|
They should have bought the old log ride from La Ronde and installed it there :haha:
https://i.cbc.ca/1.4134941.149597081...0/la-ronde.JPG |
Red Bull Raft Racing anyone? Could be the summertime companion to the Crashed Ice competition :).
|
Now imagine doing it sitting side-saddle, in a hoop dress and corset with no life jacket!
|
Quote:
|
Goes to that idea expressed elsewhere in this forum to have that whole district be a 'water district'.
Fingers crossed they'd build the olympic length & dive pool w/ Carleton/City of Ottawa in the flats! (yeah, will never happen....) |
Quote:
|
This whole area should have historic plaques about the lumber industry, indigenous peoples and the great Ottawa fire of 1900. Living artefacts should be retained and be a feature of the area history
|
Quote:
|
|
From the NCC link at the top of the thread.
Phase 3b: East of Portage Bridge (planning) The planning stage for Phase 3b of the work has started. Remediation is currently scheduled between 2025 and 2028. |
| All times are GMT. The time now is 8:24 AM. |
Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.