SkyscraperPage Forum

SkyscraperPage Forum (https://skyscraperpage.com/forum/index.php)
-   Cancelled Project Threads Archive (https://skyscraperpage.com/forum/forumdisplay.php?f=654)
-   -   NASHVILLE | Crescent Demonbreun | 410 FT | 35 FLOORS (https://skyscraperpage.com/forum/showthread.php?t=222264)

futuresooner Apr 18, 2016 11:50 PM

NASHVILLE | Crescent Demonbreun | 410 FT | 35 FLOORS
 
This proposal comes as a partnership with Nashville-based Pearl Street Partners and Charlotte-based residential titan Crescent Partners to build the 2nd largest and tallest apartment development in Nashville, after 505 currently U/C at 5th Ave North & Church St. This site was to be an spec office tower adjacent to Turnberry's JW Marriott that is currently in site-prep.

Nashville Post
http://www.nashvillepost.com/busines...for-sobro-site

The Tennessean
http://www.tennessean.com/story/mone...obro/83198968/

Nashville Business Journal
http://www.bizjournals.com/nashville...-35-story.html

https://www.urbanplanet.org/forums/u...446d4e4fc2.jpg
https://www.urbanplanet.org/forums/u...492b2d4c51.png
http://r3.nashvillepost.com/files/ba...539590ae0e.jpg

shakman Apr 19, 2016 4:41 PM

Office tower proposal looked better.

BnaBreaker Apr 19, 2016 8:10 PM

Quote:

Originally Posted by shakman (Post 7413010)
Office tower proposal looked better.

I like the design of this tower better, but I definitely loved the previous proposal better at street level and how it connected to the JW Marriott.

BnaBreaker Apr 19, 2016 8:11 PM

So apparently, the excavation has been happening on this for some time now, and it should rise along side the hotel. A start date in the first quarter of 2017 is being targeted.

Urbannizer Sep 19, 2016 7:05 PM

Cancelled

http://www.bizjournals.com/nashville...-in-sobro.html


All times are GMT. The time now is 1:54 AM.

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.