New subdivision developments
This is probably the thread surrounding suburban sprawl - this is an element I often follow.
I'm also adding the list of newer developments across the suburbs (Ontario side and only inside Ottawa for the moment). Some them are proposed (PR)/approved (AP) or under development (UD). Also I don't know the name of many subdivisions/new neighborhoods, and the list may be incomplete - anyone with more and/or precise details can post it here Kanata/Stittsville * Morgan's Grant/Brookside (UD, both sides of March Road north of Kanata North Business Park) - I've seen some bulldozing east of March Road this summer * Fairwinds/Mahogamy/Kanata West/Carp River (UD, PR, portions under development south of Scotiabank Place, proposed north of Scotiabank Place along Huntmar RD) * Bridlewood (UD, AP,most of the area east of Eagleson Road is done, several homes built west of Eagleson south of Kanata South Business Park) * Fernbank (PR, under consultation, between Stittsville and Terry Fox Drive) * Shea Road/Terry Fox Drive/Fallowfield Road/Fernbank Road, (PR, proposed by Calgary developper, which might extend further east to near Barrhaven so to basically have a full suburban area from Stittsville to Leitrim in the very long range) * North Stittsville (Jackson Estates, UD north of Hazeldean Road and Stittsville Main) * West and South Stittsville (UD, west portion west of Stittsville Main and south section south of Fernbank Road) * Carp (UD, likely north of the landfill) * Kanata Lakes (UD, a new proposal for the area around Richardson Side Road and Terry Fox Drive and possibly south/along the future Terry Fox extension) * Richmond (sale of parcel of land in the area which may result in possible new large subdivision) Riverside South/Barrhaven/Manotick * Chapman Mills (UD, both side of Woodroffe south of Strandherd although most of the eastern section is done) * Longfields (UD, mostly done north of Strandherd and south of the future extension of the Transitway from Fallowfield) * Cedarview/Kennevale (UD, near Strandherd and Cedarview) * Half Moon Bay (UD, south of the Jock River between the 416 and Greenbank, some homes on both sides of Cambrian) * Barrhaven Mews (UD, between Strandherd and the Jock River and west of Jockvale/Greenbank) * Stonebridge (UD, most of the area east of Jockvale is done with portions between Greenbank and Jockvale south of the Jock River well underway. * Manotick (PR, proposal by Minto to basically double the size of Manotick) * Riverside South (UD, sections south of Earl Armstrong as well as east of Limebank have applications filed) * Leitrim (UD, south of Bank and Leitrim area) Orleans/Cumberland * Avalon (Tenth Line Road area south of Innes (UD) * Notting Gate (Trim Road south of Innes) (UD) * Eastboro (PR/UD), south of the Notting Gate area * Fallingbrook East north and east of the Trim/Innes intersection (UD) * Bradley Estates (UD south of Navan Road, along Renaud Road) * Mer Bleue (UD) SW corner of Innes and Tenth Line. E-Map shows some streets * West of Petrie's Landing along on North Service Road (UD) Gatineau * Le Plateau/Le Plateau Symmes/Le Musee (Aylmer sector) (UD) * Near Lucerne and Fraser Roads (Aylmer sector) (UD) * L'Escarpement de Limbour (Gatineau sector/Cantley) (UD) * Buckingham sector - near Lepine and Hwy 315 (AP) * Les Hauteurs/Davidson (near La Verendrye and Labrosse Blvds - Gatineau sector) (UD) * Cote des Neiges (Greber Blvd between La Verendrye and Paiement, Gatineau sector) (UD, mostly complete) * Jardins Lavigne (Aylmer sector north of des Allumettieres Blvd between Eardley and east of Wilfrid Lavigne Blvds) (UD/PR, many sections are completed since several years) * Near Lorrain and La Verendrye (UD, don't know the name of the community though) * Cook Road in Aylmer North (PR) * Chelsea Creek (PR) Others * Small development south of Prince of Wales and Hog's Back area * Small development south of Hunt Club between Paul Anka and Uplands * Centrepointe: Future development planned near the former Nepean City Hall and Baseline Transit Station * There was also some bulldozing that took place this summer at Hunt Club and Cahill (a somewhat large space) * Small development near Albion and Lester Road |
Good idea for a thread... I also like to follow these developments. here's the Half Moon Bay site plan...
|
Mahagony Manotick (Minto) Development Concept Plan (July 07)
There is a meeting tonight about it, where I think the finalized plan will be presented. edit: Citizen article Quote:
|
I just heard on the news that Algonquin College is selling their land for some sort of "town centre" development called Centrepointe (?)... it would involve rerouting the Baseline transitway station..
|
Quote:
http://ottawa.ca/calendar/ottawa/cit...s/image008.jpg |
^ that's it. Apparently it's a go, according to Michael O'Byrne just moments ago..
|
I like the townhomes near Centrepointe. Now all we need is LRT running along Baseline, and we could start to see some serious improvement in the area.
|
That's looks quite good indeed, although not sure if Baseline was part of the LRT plans, I think it was further south closer to Hunt Club however I think it was close to one of the vision-proposal METRO lines. I know there are plans for making the 118 a BRT route with better transit priority measures (there are gradually doing it in the eastern part of the road, with some rush-hour extension to Orleans). So they will have some excellent transit service also with the future completion of the Gap of the Southwest Transitway and being not too far from the future Western Transitway
Also I may suspect that this the project in question (in stake) that explained why Rick Chiarelli voted for the re-opening of Albion Road, although I don't see how the Albion issue would influence this project - it is much faster via the Parkway and Heron |
:previous: Baseline was never intended for LRT, but I can dream, can't I? ;)
|
Well maybe, but since the MTTF prefers existing rail, we can dream. Also I've seen in the past an article that some Centrepointe residents wants to close the eastern intersection of Baseline and Centrepointe because of growing traffic concerns because of that. Looking at the Public Consultations section of the City they are planning a new intersection (Baseline and Ben Franklin Place) which would probably ease the potential problems. Route 118 will no longer likely do the circuitous loop at Baseline and Woodroffe thus saving a few minutes of traffic jam.
|
Quote:
http://www.ottawa.ca/public_consult/...isplay_en.html Closeup here: http://www.ottawa.ca/public_consult/...r_section4.jpg |
I think the city was originally planning BRT along Baseline, like the B-line in Vancouver, not the Transitway.
|
re: BRT on baseline
TMP has these plans Baseline Corridor Phase I- Transit priority Phase II- Semi-exclusive rapid transit (Navaho Drive to Data Centre) (Baseline Road Widen from four to six lanes to create bus lanes from Navaho Drive to Prince of Wales Drive) Provides high quality city-wide transit access to employment, commercial and institutional land uses adjacent to Baseline Road, and fast, reliable service to major rapid transit lines for corridor residents. Also, provides key link between Southwest and Southeast bus rapid transit network segments by avoiding downtown and promotes corridor redevelopment particularly at Confederation Heights Under Transplan 2009, this was supposed to happen, don't know the status of anything now, but there is some stuff happening on Heron: Transit priority measures ·Heron/Baseline – Transit priority measures are required to reduce travel times and to improve the reliability of service between Heron Station, Baseline Station, and Queensway-Carleton Hospital. These improvements will increase the attractiveness of the new crosstown east-west rapid transit 90-series bus routes that will bypass downtown. A transit priority study is underway by consultants to the Traffic and Parking Operations Branch; this study will define the feasible options (in two phases – short-term and longer-term) and make estimates of costs for each element. The first, short-term, phase of these measures will be required by early 2007, so that the crosstown rapid transit bus routes can be in place to encourage customers to bypass the heavy construction in downtown for the light rail line. Possible transit priority measures include: -Signal priority; -Signal pre-emption; -Bus lanes; -Removal of bus bays and installing bus bulbs; -Traffic management measures such as queue relocation and traffic metering; -Turn and operation restrictions to non-transit vehicles; -Corridor-wide traffic management and public information systems favourable to transit users. |
Longfields Concept Plan
City-owned and planned subdivision... Quote:
|
Quote:
|
Quote:
I've talked to someone at the city (real estate services) about this, and this person was really excited about the whole project and how a lot of the city's current thinking and expectations about mixed uses/densities, parks, transportation, and design were being incorporated into this project. They felt that there was a general level of support for their initiative. Apparently the draft plan of subdivision and rezoning were submitted in June 07 and it should be approved by December 07... from October 10th council Quote:
http://ottawa.ca/calendar/ottawa/citycouncil/csedc/2007/11-06/ACS2007-CMR-CSE-0012-(Complete).htm http://ottawa.ca/calendar/ottawa/cit...s/image004.jpg |
Quote:
|
Quote:
|
I've check the E-MAP for the City of Ottawa which now shows new streets west of Tenth Line south of Innes which appears to be residential (or planned) streets. I suspect they are starting (or very soon) to do some bulldozing for the new Mer Bleue Community in south Orleans. The new update seems to show more streets/bulldozing done further south and east in Avalon as well as well as the area west of Jockvale Road in South Barrhaven
|
|