MONTREAL | Tour Des Canadiens 3 | 168 M / 551 FT | 53 FLOORS
Part of the Quad Windsor project in downtown Montreal. Twin towers of 168M (not 166M)
https://mtlurb.com/uploads/monthly_2...2582fa75ef.jpg TDC 3, 430 units https://mtlurb.com/uploads/monthly_2...1b9b6989d7.jpg tower on left is TDC 3, tower on the right, TDC 2 is U/C. pics from UrbMtl from MTLURB.com So far in the Quad Windsor project Complete 1. TDC 1- 50 floor condo, 552 units-165M 2. Deloitte office tower, 27 floors, 500,000 Sq. Ft-135M U/C 1. TCD 2- 590 units, 53 floors, 168M Proposed 1. TCD3-490 Units, 53 floors, 168M 2. 750 peel- 2 office towers, floors (?), 180M/130M (proposed) 3. 600 peel- 3 condo towers, retail, floors (?) potentially 180M+ Potential final product http://www.boma-quebec.org/boma/data...0_quad_low.jpg http://www.boma-quebec.org/courses-d...i-quad-windsor |
And here are the renders for TDC3, a huge downgrade from the previous versions.... sigh... Montreal get's screwed again
https://mtlurb.com/uploads/monthly_2...8067565e94.jpg And a bonus! A cheaper, downscaled Quad Windsor project!!! https://mtlurb.com/uploads/monthly_2...Y-ia0BO5G.webp |
This new version looks straight out of 1989 (I think it's the corner balconies..). Would have been a nice building back then, but in 2017, not so much...
|
Pile driving has started for TDC3! another 170m tower to rise downtown!
https://the514lifeblog.files.wordpre...436.jpg?w=1140 https://the514lifeblog.files.wordpre...619.jpg?w=1140 Source: https://the514lifeblog.wordpress.com...pdate-1-19-18/ |
|
|
This thread should be moved into Construction (project with two yellow cranes).
Webcam: http://www.devisubox.com/dv/dv.php5?...sRef=2O1GPG6FR https://farm2.staticflickr.com/1782/...770c10b3_h.jpg |
TDC 3 rising rapidly next to TDC 2
https://the514lifeblog.files.wordpre...8-1.jpg?w=1140 Source: https://the514lifeblog.wordpress.com...ber-15th-2018/ |
|
|
TDC3 with TDC2 on the left side
https://the514lifeblog.files.wordpre...043.jpg?w=1140 Source: https://the514lifeblog.wordpress.com...uction-update/ |
|
|
|
|
|
Montreal is looking good, I hope for a 300+ one day
|
^Won't happen in the city proper. Height limits.
|
|
This is close to completed with the Canadiens sign installed at the top.
|
All times are GMT. The time now is 2:28 AM. |
Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.