|
I wish there was a way on each site to go to a page to JUST see the original plans. I was trying to compare the buildings in the stage they are now against the conceptual plans and gave up trying to find them. It would be nice if there was a go to page for site plans for all sites here.
|
Quote:
|
Thanks!!!It appears then the other 2 piers are no where near finished and have a lot yet to be built.
|
Quote:
There's an art installation type piece too in the central pier-like structure that may end up lit up at night. Cue lighthouse jokes here. I think this one has the potential to look good though, and it will be visible in a lot of skyline shots. |
Quote:
|
Quote:
They will also be cladding it in Wallace sandstone so that is another hint that this will be of a higher quality. |
Quote:
|
Quote:
|
Quote:
|
Quote:
Fingers crossed it ends up looking good then. Like you, Someone123, I have very high hopes for this one. |
|
Quote:
"Steel was originally considered for cladding but finally an alloy of copper called Muntz metal, from Ontario, was used. Wallace sandstone from local quarries has been used on numerous public buildings and was a good fit for the Queen’s Marque. “Muntz metal has a lot of the characteristics of copper but doesn’t turn green,” he explained. “It has the waterfront shipyard grit of weathering steel but with the sophistication of Muntz." https://canada.constructconnect.com/...-queens-marque |
|
Quote:
|
Quote:
http://blog.onlinemetals.com/new-mun...0-brass-sheet/ |
By his statement:
Quote:
|
Quote:
|
|
|
All times are GMT. The time now is 1:28 AM. |
Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.