Wattleigh May 10, 2013 7:57 PM

HOUSTON | Energy Center III - IV & V | 317 - 355 - ? FT | 20 - 22 - 18 FLOORS
 
http://blog.chron.com/primeproperty/...2013/05/CP.jpg
-c/o Houston Chronicle "Prime Property" blog post


Project in brief: This is a continuation of the "Energy Center" project which began at the northeast intersection of Eldridge Parkway & the Katy Freeway. That phase included a pair of 12-story towers completed in 2008 & 2009.

In April 2012, it was reported that Trammell Crow & Principal Real Estate would purchase a 19 acre portion of land on the southwest corner of that intersection.

Groundbreaking for Energy Center Three took place in January of this year.

While construction has been underway on the first tower, this week, it was reported that ConocoPhillips has agreed to lease all of Energy Center Three and half of the estimated 600,000 square feet of Energy Center Four. Construction for that building is expected to begin later this year.

Construction photos are available on the EC 3 Website. As of April it looked like the photos below. I'm not in the area now, but it sounds like they may be up to a couple of floors now...

http://www.energycenterthree.com/images/april1.jpg

http://www.energycenterthree.com/images/april2.jpg

http://www.energycenterthree.com/images/april3.jpg

JoninATX May 12, 2013 9:11 AM

The energy corridor continues to expand. :cool:

toxteth o'grady May 29, 2013 5:57 PM

And Conoco is loading up.

Urbannizer Jul 11, 2013 11:35 PM

http://www.bisnow.com/testzz/writer/...Center-III.jpg

Quote:

Originally Posted by Bisnow
Trammell Crow is well under way on Energy Center Three at Eldridge and I-10. ConocoPhillips is leasing the entire 550k SF property and is snagging half of 600k SF Energy Center Four. That property will begin development later this year.

http://www.bisnow.com/commercial-rea...-paul-frazier/

Wattleigh Jul 19, 2013 6:53 PM

Photo from within the past few days from 'trae' on HAIF/here

http://www.houstonarchitecture.com/h...attach_id=3685

Urbannizer Aug 20, 2013 8:47 AM

8/18 by me

http://farm4.staticflickr.com/3782/9...4410898f_b.jpg

http://farm4.staticflickr.com/3812/9...f032c77d_b.jpg

toxteth o'grady Aug 28, 2013 1:55 PM

Has Four started yet?

Urbannizer Aug 29, 2013 11:56 AM

Quote:

Originally Posted by toxteth o'grady (Post 6247082)
Has Four started yet?

Four starts in December.

Urbannizer Nov 26, 2013 9:59 PM

11/25 by me

http://farm4.staticflickr.com/3791/1...3f826138_b.jpg

http://farm8.staticflickr.com/7448/1...79f64730_c.jpg

http://farm8.staticflickr.com/7355/1...f38e2108_c.jpg

diskojoe Nov 27, 2013 1:37 AM

I was wondering what this was. Should have known it was oil and gas.

shakman Nov 27, 2013 2:41 AM

Thanks for the updates. That wonderful weather is upon us here in the Mid-Atlantic.

Wattleigh Dec 10, 2013 8:47 PM

Perhaps the thread should be updated to include the fifth building?

http://www.bizjournals.com/houston/n...s-rest-of.html

Quote:

Dec 10, 2013, 10:55am CST

ConocoPhillips to fill another Energy Center building, more construction on the way


Emily Wilkinson
Print Editor -Houston Business Journal

Houston-based ConocoPhillips (NYSE: COP) has preleased the remaining space at Energy Center Four, bringing its total lease for the complex to 1.2 million square feet and prompting the developer to start a fifth building.

In May, the exploration and production company signed on for 850,000 square feet in the complex, which is being developed by Dallas-based Trammell Crow Co. and Des Moines, Iowa-based Principal Global Investors. That lease included all of Energy Center Three, which topped off earlier this year, and half of Energy Center Four, which has site work underway.

Cody Armbrister and Steve Rocher, both executive vice presidents with CBRE Group Inc.’s Houston office, represented the landlord. The tenant representative was not disclosed.

The company will occupy the entire 550,000-square-foot Energy Center Three, which is expected to be complete by the second quarter of 2015, and the entire 600,000-square-foot Energy Center Four, which should be complete in the second quarter of 2016.

The developers will break ground on Energy Center Five, a 500,000-square-foot, 18-story tower, in April.

Urbannizer Dec 11, 2013 7:02 AM

Title updated, here's a rendering for EC5

http://farm4.staticflickr.com/3818/1...08942391_b.jpg

Urbannizer Dec 18, 2013 3:17 PM

All three:

http://farm8.staticflickr.com/7291/1...7853166c_b.jpg

Urbannizer Dec 24, 2013 4:45 AM

12/23 by Brijonmang

http://img.tapatalk.com/d/13/12/24/qapetuha.jpg

http://img.tapatalk.com/d/13/12/24/y4y3u6yp.jpg

http://img.tapatalk.com/d/13/12/24/qynadege.jpg

toxteth o'grady Jan 9, 2014 4:34 AM

How long before CoP decides they need space in that fifth building?

Urbannizer Jan 15, 2014 2:16 AM

Energy Center Five

http://farm3.staticflickr.com/2814/1...71332bfb_b.jpg

Urbannizer Jan 20, 2014 7:57 PM

1/19 c/o ChannelTwoNews

http://i177.photobucket.com/albums/w...ps1fdcfe55.jpg

http://i177.photobucket.com/albums/w...ps9a27ad98.jpg

Wattleigh Jan 22, 2014 2:03 AM

Photos from today by me...

http://i177.photobucket.com/albums/w...ps36f4c450.jpg

http://i177.photobucket.com/albums/w...pse7b0c9ce.jpg

http://i177.photobucket.com/albums/w...psd9c9a669.jpg

http://i177.photobucket.com/albums/w...ps64ee9207.jpg

http://i177.photobucket.com/albums/w...ps36483226.jpg

http://i177.photobucket.com/albums/w...ps03ef8462.jpg

Urbannizer Jan 27, 2014 6:05 AM

1/26 by Gator80

http://farm8.staticflickr.com/7357/1...367c63e4_c.jpg