The article mentions that the project is slated to be done by October of 2022. Wouldn’t that indicate that shovels should be in the ground sometime this spring?
|
edit
|
I was on real estate site Point2homes for Saskatoon and specifically Nutana neighborhood and saw there are a number of units up for what I assume is "re-sale" for Highpoint already. I guess a number of the original buyers bought on spec with re-sale their intent.
Still no idea how sales for that project have gone, but hoping strong enough to see action on the site this spring. |
Quote:
|
I was talking to someone selling units last week - apparently they're selling as good as river landing sold - just not as crazy as the insane bite the first time where it's a weekend sell out, but less backing out of their deposits after a few months. Construction is all on track for this year as is planned.
|
Quote:
|
thanks for insight all. Good to hear sales are progressing well.
I would say Escala is selling very well, too which speaks volumes to the pent up demand for new build condo's in core areas. Are you listening North Prairie???? |
Quote:
|
This forum has been dead for a while. Does anyone have any intel since January for this project? Sales levels? Projected start of construction? Anything?!
|
Last I heard from someone in the know was that sales are in a place that has them confident for a fall construction start.
|
Given our current circumstances it would be an incredible morale booster if they were able to start site prep this summer. We just need some positive signs of moving forward!
(it's a given that this could only happen under safe conditions) |
All A3's are sold out and have been for a few months now.
A few weeks ago only two D1's were left and they expanded the number of D1's right up to the 16th floor (and eliminated some of the penthouse units). I assume the D1's were selling well precipitating this change. All the original D1's are gone. Also a few weeks ago there was only one C1 left. They are over 50% sold. Possibly close to 60%. |
What traditionally is the sales number required before a project feels secure enough to get shovels in the ground? Is there kind of an industry standard? Just curious.
|
Quote:
|
Quote:
|
Quote:
|
edit
|
Quote:
|
edit
|
edit
|
All times are GMT. The time now is 12:55 AM. |
Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.