SkyscraperPage Forum

SkyscraperPage Forum (https://skyscraperpage.com/forum/index.php)
-   Skyscraper & Highrise Construction (https://skyscraperpage.com/forum/forumdisplay.php?f=103)
-   -   CALGARY | Dominion | 51.2m | 15s (https://skyscraperpage.com/forum/showthread.php?t=240143)

topdog Aug 27, 2019 6:14 PM

CALGARY | Dominion | 51.2m | 15s
 
One more to the list that can go straight to construction status.

https://calgary.skyrisecities.com/fo...-agency.28547/

Big Sky Oct 20, 2020 3:13 PM

Quote:

Originally Posted by topdog (Post 8670374)
One more to the list that can go straight to construction status.

https://calgary.skyrisecities.com/fo...-agency.28547/

First tower is topped out. Second tower at grade.

Tarsus Jan 20, 2021 6:07 AM

Material is going up on the first tower, and the second tower is a couple of floors above grade.

https://calgary.skyrisecities.com/fo....28547/page-17


All times are GMT. The time now is 6:37 AM.

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2021, vBulletin Solutions, Inc.